Infrastructure

Mumbai: L&T, Megha Set To Be Awarded Thane-Borivali Twin Tunnel Project That Will Link City's East, West Via 6-Lane Road Beneath Sanjay Gandhi National Park

  • Once this 11.84 km-long road project is built beneath the Sanjay Gandhi National Park, the travel time will reduce to just around 15 minutes.

V Bhagya SubhashiniApr 26, 2023, 02:19 PM | Updated 03:54 PM IST
Project Illustration/Mumbai Live

Project Illustration/Mumbai Live


Larsen & Toubro (L&T) and Megha Engineering & Infrastructures Ltd. (MEIL) were declared the lowest bidders for the construction of one package each of the 11.84 km Thane-Borivali twin tunnel project in Mumbai. infrastructure portal The Metro Rail Guy reported.

MMRDA had invited tenders for its civil construction under 2 civil packages in December 2022

The part of the proposed tunnel will pass through the Sanjay Gandhi National Park (SGNP), the only national park in the world to be located within a metropolitan area.


MMRDA had invited tenders for its civil construction under two civil packages in December 2022 with a four-year completion deadline,

Currently, there is no direct connectivity between these areas, and commuters have to take a detour from either Ghodbunder Road in Thane or Powai. Both these roads remain gridlocked during peak hours.

The proposed project will have 10.8 km of twin tunnels and another km of approach roads on both ends (Thane and Borivali) combined. In all, a total of 23.68km of new road construction, along with a tunnel.

Thane - Borivali twin tunnel project location (Google Earth)

The three-lane tunnels, which will connect Magathane's Ekta Nagar in Borivali and Tikuji-Ni-Wadi in Thane, will be built using four giant tunnel boring machines (TBMs) at a maximum depth of 23 m below the surface.

Currently, the time to cover the distance between the western suburb of Borivali and the eastern suburb of Thane in the Mumbai metropolitan region (MMR) is more than an hour. Once this 11.84 km-long road project is built beneath the Sanjay Gandhi National Park, the travel time will reduce to just around 15 minutes.

The project is estimated to be complete in five years and will cost Rs 13,200 crore. It will necessitate the acquisition of 16.54 hectares of private land and 40.46 hectares of land within the Sanjay Gandhi National Park.

Each of the tunnels will have three lanes (six in total) and interconnecting tunnels for emergency purposes.


The National Board for Wildlife has already granted wildlife clearance for the project.

The clearance from the Union environment ministry's Regional Empowered Committee (REC) in Nagpur is expected to come through after a sub-committee set up by them to assess the impact of the project will be submitted.

The IIT-Bombay study concluded that the project would not have any significant impact on groundwater, as the size of the tunnel compared to the rest of SGNP was "insignificant".

Considering that the tunnel will pass through SGNP, the Maharashtra State Road Development Corporation Limited (MSRDC) has promised to take special precautions to avoid causing harm to the park's biodiversity by using tunnel-boring machinery to prevent upsetting the lives of the park's animals and flora.

Join our WhatsApp channel - no spam, only sharp analysis