Infrastructure

Sikkim Rail Connectivity Surges, Railway Board CEO Assesses Progress Of Sivok-Rangpo BG Project

Swarajya StaffApr 08, 2024, 01:45 PM | Updated 01:59 PM IST
A bridge under construction on Sivok-Rangpo Rail Line (Ministry Of Railways)

A bridge under construction on Sivok-Rangpo Rail Line (Ministry Of Railways)


Rail connectivity to Sikkim may soon become a reality with the work on the Sivok-Rangpo project progressing well.



Map of Sivok-Rangpo rail line

It is characterised by 14 tunnels, 13 major bridges, 9 minor bridges and 5 stations. The length of the longest tunnel (T-10) is 5.3 km and the length of the longest bridge (Br-17) is 425 metres. About 38.65 km of the entire project alignment is passing through tunnels.


This is o­ne of the most prestigious o­ngoing National Projects in India and o­n completion, it will mark the first railway connection to the state of Sikkim.

Join our WhatsApp channel - no spam, only sharp analysis