Swarajya Logo

Infrastructure

Mumbai - Ahmedabad High-Speed Rail: Japan To Modify Bullet Trains For Indian Conditions, Trials From 2026

PTIApr 12, 2022, 06:54 PM | Updated Apr 13, 2022, 10:40 AM IST
A bullet train (Photo via NHRSCL Website)

A bullet train (Photo via NHRSCL Website)


Japan's high-speed Shinkansen trains will be modified for Indian conditions like temperature, dust, and weight before they are sent to India for the country's ambitious 'bullet train project'. Satish Agnihotri, Managing Director, National High-Speed Rail Corporation Limited (NHSRCL) said the project is slated to complete a 48 km section between Surat-Billimora in 2027, with the first trials to be held a year earlier.

He, however, said the project is stuck in Maharashtra due to land acquisition issues. "We will get the E5 Shinkansen series trains currently operating in Japan. However, we are conducting studies to upgrade them to Indian conditions in terms of dust and temperature,'' Agnihotri said.

The E5 series is Japanese Shinkansen high-speed train type built by Hitachi and Kawasaki Heavy Industries.

They are capable of running at a speed of 320 kmph and are 3.35 m wide, the widest among such trains are available in countries like France and Germany.

Sources said another aspect that the Japanese are working on is to ensure that the trains can carry the "Indian weight" as the Japanese are lighter.


Officials said actual orders will be placed after the modifications are completed.

Talking about the project, the Japanese ambassador to India, Satoshi Suzuki noted, "I am very satisfied, actually impressed by the progress made using the latest technology. We are not exporting a second-class train. We will share the same one (E5 series), rather an improved one because the series has been in operation for several years. So, by the time India has its bullet train, we will make sure that they get the latest technology.

"This series of trains are running in the northern part of Japan and is equipped with various safety measures. It has anti-seismic technology. This is the best one we could share," he said. In Gujarat and Dadra and Nagar Haveli, 100 percent of civil contracts for the construction of the entire route, that is, 352 kms have been awarded to Indian contractors.

In Gujarat, track work for 237 km has already been awarded and the balance of 115 km will be awarded soon.

(This story has been published from a wire agency feed without any modifications to the text. Only the headline has been changed.)

Join our WhatsApp channel - no spam, only sharp analysis