Insta

KMRL Plans To Launch Kochi Water Metro Services In September

V Bhagya SubhashiniAug 03, 2022, 05:28 PM | Updated 05:28 PM IST
Water Metro boat of Kochi Metro at Cochin Shipyard (Via Twitter)

Water Metro boat of Kochi Metro at Cochin Shipyard (Via Twitter)


After the Cochin Shipyard delivered two more boats on Saturday (July 30), Kochi Metro Rail Limited (KMRL) is set to provide Water Metro services in September.

Before being commissioned, the boats will undergo intensive technical trials for about a month.

According to a KMRL official, four electric hybrid boats have already been delivered, and a fifth is expected to arrive soon.


The Cochin Shipyard is building a total of 23 electrically propelled fast hybrid boats with 100-passenger capacity for the water metro project.

For the Rs 747-crore water metro project, 15 routes have been identified, connecting 10 islands spanning 76 kilometers.

Identified routes for Kochi Water Metro ( KMRL)

Of the total 38 jetties planned, the ones at High Court, Vypeen, and Mulavukad are almost finished, and the ones at Vyttila and Kakkanad are already ready. There will be 14 more jetties ready by December.


Illustration of Kochi water terminal (KMRL)


Join our WhatsApp channel - no spam, only sharp analysis