Insta
Hyderabad Metro (@srinidurvasula/Twitter)
Hyderabad Metro officials claim that the work on Nagole-HiTec City Corridor will be finished by December, reports Times of India (TOI).
While civil works between the Ameerpet and HiTec City Metro stations have been completed, signalling works are being carried out beyond Cyber Towers up to Trident Hotel, said Metro Rail officials. They added that a train reversal facility is being created beyond the HiTec City Metro station for the Nagole-HiTec City corridor.
According to the officials, high frequency of one train every 3.5 minutes will be maintained during peak hours in other Metro stretches soon after the signalling works up to HiTec City are completed.
Traffic cops were reported as saying that the diversions would be back soon to facilitate metro construction works between HiTec City station and Raidurg station (Mindspace).
The Hyderabad Metro Rail currently sees daily commute of two lakh passengers. Stations like LB Nagar, Miyapur and Ameerpet interchange station seeing the highest footfalls every day, said Metro Rail officials, as reported by TOI.
Support Swarajya's 50 Ground Reports Project & Sponsor A Story
Every general election Swarajya does a 50 ground reports project.
Aimed only at serious readers and those who appreciate the nuances of political undercurrents, the project provides a sense of India's electoral landscape. As you know, these reports are produced after considerable investment of travel, time and effort on the ground.
This time too we've kicked off the project in style and have covered over 30 constituencies already. If you're someone who appreciates such work and have enjoyed our coverage please consider sponsoring a ground report for just Rs 2999 to Rs 19,999 - it goes a long way in helping us produce more quality reportage.
You can also back this project by becoming a subscriber for as little as Rs 999 - so do click on this links and choose a plan that suits you and back us.
Click below to contribute.
Latest