Insta
Jayadeva Flyover, Bannerghatta Road. (Srikanth Ramakrishnan/Wikimedia Commons)
Power supply will be disrupted in parts of Bengaluru city from 11 am to 2 pm on Monday (18 March) in view of civil works being carried out near Jayadeva Flyover, reports The Times of India.
The affected areas would include: NS Palaya, Mico Layout, Bannerghatta Road, BTM II stage, IAS colony, EWS Colony, Madina Nagara and surrounding places.
The demolition of the flyover at Jayadeva Junction was postponed last year in deference to commuters’ convenience and scheduled towards the end of March 2019.
Bengaluru Metro Rail Corporation Limited (BMRCL) will carry out metro works by demolishing the loop connecting the Bannerghatta Main Road with the main carriageway on Outer Ring Road.
The flyover will reportedly be replaced with a multi-level structure providing elevated Metro and road connections. It will also house interchange stations for three lines: RV Road-Bommasandra (Reach 5) and Silk Board-KR Puram (Phase 2A).
Support Swarajya's 50 Ground Reports Project & Sponsor A Story
Every general election Swarajya does a 50 ground reports project.
Aimed only at serious readers and those who appreciate the nuances of political undercurrents, the project provides a sense of India's electoral landscape. As you know, these reports are produced after considerable investment of travel, time and effort on the ground.
This time too we've kicked off the project in style and have covered over 30 constituencies already. If you're someone who appreciates such work and have enjoyed our coverage please consider sponsoring a ground report for just Rs 2999 to Rs 19,999 - it goes a long way in helping us produce more quality reportage.
You can also back this project by becoming a subscriber for as little as Rs 999 - so do click on this links and choose a plan that suits you and back us.
Click below to contribute.
Latest