News Brief

464 km Raipur – Visakhapatnam Greenfield Expressway: HG Infra Wins 2 Packages In Odisha Worth Over Rs 2297 crores

  • HG Infra Engineering Ltd was awarded Odisha package-5 (for developing the 44 km long, six-lane Kaliagura-Baunsaguar section) as well Odisha package-6 (for developing the 44 km long, six-lane Koraput to Pattangi section) of Raipur-Visakhapatnam Economics Corridor.
  • The Raipur – Vizag Economic Corridor project is being developed under Bharatmala Pariyojana Phase-I. The expressway's greenfield alignment will pass through the states of Chhattisgarh (124.611 km), Odisha (262.211 km) and Andhra Pradesh (99.629 km). The project has been divided into 19 civil packages with a 4 year deadline. It is estimated to cost Rs. 20,000. crore. When complete, the distance from Raipur to Vizag will reduce from 590 km to 464 km and reduce travel time from 14 hours to about 7 hours.

India InfrahubOct 27, 2021, 10:43 AM | Updated 10:47 AM IST
HG Infra Project In Agra

HG Infra Project In Agra


HG Infra Engineering Ltd has received Letter of Award (LoA) from National Highways Authority of India (NHAI) for two packages of the 464 km Raipur – Visakhapatnam Economic Corridor (NH-130CD & EC-15), popularly known as the Raipur-Vizag Expressway.

The Raipur – Vizag Economic Corridor project is being developed under Bharatmala Pariyojana Phase-I. The expressway will originate from Abhanpur near Raipur (Chhattisgarh) and ends at Sabbavaram near Vizag (Andhra Pradesh). The expressway's greenfield alignment will pass through the states of Chhattisgarh (124.611 km), Odisha (262.211 km) and Andhra Pradesh (99.629 km).

The project has been divided into 19 civil packages with a 4 year deadline. It is estimated to cost Rs. 20,000 crore. When complete, the distance from Raipur to Vizag will reduce from 590 km to 464 km and reduce travel time from 14 hours to about 7 hours.

HG Infra Engineering Ltd was awarded Odisha package-5 (for developing the 44 km long, six-lane Kaliagura-Baunsaguar section) as well Odisha package-6 (for developing the 44 km long, six-lane Koraput to Pattangi section) of Raipur-Visakhapatnam Economics Corridor.


HG Infra Engineering Ltd is already executing Andhra-Package 1 of the expressway project under which it is developing a 31-km six lane Aluru-Jakkuva section on hybrid annuity mode. The total length of of the project is 31.767 Kms. The company won the bid quoting a project cost of Rs 1,060.11 crore. The project completion period is 730 days.

Established in 2003, HG Infra Engineering Ltd is one of the leading player in the development of roads and highways infrastructure. The main business includes providing engineering-procurement-and-construction (EPC) services on a fixed-sum turnkey basis and undertaking civil construction and related infrastructure projects. The company has a strong presence in the states of Rajasthan, Haryana, Uttar Pradesh, Maharashtra, Telangana and Andhra Pradesh.

464 km Raipur – Visakhapatnam Greenfield Expressway Alignment

Join our WhatsApp channel - no spam, only sharp analysis