Insta
Train 18 Vande Bharat Express. (@proicfindrlys/Twitter)
Indian Railways’ flagship Vande Bharat Express is running on full occupancy and authorities hope to recover the manufacturing cost in just 12 to 15 months, Times of India has reported.
The current earnings of the premium train stand at Rs 7 crore per month which is aided by the fact that all the available seats are being booked by passengers. As per Railways Board member Rajesh Agarwal, Indian Railways is confident of recovering the sunk manufacturing cost of Rs 100 crore in around a year, thanks to the high demand.
The revenue is also aided by the fact that no concession is allowed on the train and the fare bracket is marginally higher as compared to other premium trains. Agarwal also speculated that the semi-high speed train is also attracted passengers who earlier avoided travelling by trains.
Currently, the Vande Bharat Express connects New Delhi and Varanasi for five days per week. Integral Coach Factory (iCF) is already reported to have delivered the second Train-18 rake to the Indian Railways.
Support Swarajya's 50 Ground Reports Project & Sponsor A Story
Every general election Swarajya does a 50 ground reports project.
Aimed only at serious readers and those who appreciate the nuances of political undercurrents, the project provides a sense of India's electoral landscape. As you know, these reports are produced after considerable investment of travel, time and effort on the ground.
This time too we've kicked off the project in style and have covered over 30 constituencies already. If you're someone who appreciates such work and have enjoyed our coverage please consider sponsoring a ground report for just Rs 2999 to Rs 19,999 - it goes a long way in helping us produce more quality reportage.
You can also back this project by becoming a subscriber for as little as Rs 999 - so do click on this links and choose a plan that suits you and back us.
Click below to contribute.
Latest