Surat - Chennai Expressway: PM Modi To Lay Foundation Stone For Two Greenfield Sections In Karnataka

Surat - Chennai Expressway: PM Modi To Lay Foundation Stone For Two Greenfield Sections In Karnataka

by India Infrahub - Jan 17, 2023 10:50 PM +05:30 IST
Surat - Chennai Expressway: PM Modi To Lay Foundation Stone For Two Greenfield Sections In KarnatakaPurvanchal Expressway in UP. (Representative Image)
Snapshot
  • After 1,350 km long Delhi - Mumbai Expressway, the Surat - Chennai Expressway at 1,270 km length will be the second longest expressway in India.

    Surat - Chennai Expressway will pass through Gujarat, Maharashtra, Karnataka, Telangana, Andhra Pradesh, and Tamil Nadu connecting Surat near the western coast with Chennai on the eastern coast.

Further boosting the road connectivity in Southern India, Prime Minister Narendra Modi on Thursday (19 January) is going to lay the foundation stone of Surat - Chennai Expressway in Karnataka.

PM Modi will be laying the foundation stone for two greenfield sections of this six lane expressway.

The length of these two expressway sections are 65.5 km and 71 km. They will be developed at a cost of Rs 2,000 crore and Rs 2,100 crore respectively.

While PNC Infratech is constructing the 71 km section between Badabal village and Maradagi S Andola village in Kalaburagi District, Dilip Buildcon is building the 65.5 km section between Maradgi S Andola and Baswantpur in Yadgir district.

In total, Surat - Chennai Expressway’s alignment travels for 177 km in Karnataka from Badadal village in Kalaburagi district to Singnodi in Raichur district.

An Expressway Connecting Western And Southern India

Surat - Chennai Expressway will pass through six states- Gujarat, Maharashtra, Karnataka, Telangana, Andhra Pradesh, and Tamil Nadu. It will reduce the road distance between Surat and Chennai from the present 1,600 km to 1,270 km.

The project is envisioned as a combination of two partially access-controlled economic corridors i.e Chennai to Solapur and Solapur to Surat). It includes construction of greenfield stretches and upgrading brownfield sections.

Yellow line indicates approximate alignment of Surat - Chennai Expressway (@theTBnC/Twitter)
Yellow line indicates approximate alignment of Surat - Chennai Expressway (@theTBnC/Twitter)

The corridor will pass through major cities like Nashik, Ahmednagar, Solapur, Kalaburgi, Kurnool, Kadappa, and Tirupati.

While the Surat –Solapur part (via Nashik – Ahmednagar ) will be 564 km long, the Solapur - Chennai part (via Kurnool) is of 707 km length.

The stretches between Surat and Ahmednagar via Nasik and Akkalkot to Kurnool section that links Maharashtra with Telangana and Andhra Pradesh via Karnataka will be developed as greenfield alignments.

The greenfield portion of the corridor is close to 520 km. The rest of the corridor includes upgradation of the existing two-lane roads.

This expressway project is estimated to cost anywhere between Rs 45,000 to Rs 50,000 crore. After 1,350 km long Delhi - Mumbai Expressway, the Surat - Chennai Expressway at 1,270 km length will be the second longest expressway in India.

Get Swarajya in your inbox everyday. Subscribe here.

An Appeal...

Dear Reader,

As you are no doubt aware, Swarajya is a media product that is directly dependent on support from its readers in the form of subscriptions. We do not have the muscle and backing of a large media conglomerate nor are we playing for the large advertisement sweep-stake.

Our business model is you and your subscription. And in challenging times like these, we need your support now more than ever.

We deliver over 10 - 15 high quality articles with expert insights and views. From 7AM in the morning to 10PM late night we operate to ensure you, the reader, get to see what is just right.

Becoming a Patron or a subscriber for as little as Rs 1200/year is the best way you can support our efforts.

Become A Patron
Become A Subscriber
Comments ↓
Get Swarajya in your inbox everyday. Subscribe here.
Advertisement

Latest Articles

    Artboard 4Created with Sketch.