CMRL's Revised Phase II Corridor 5 Alignment Near Koyambedu To Enable Straighter Route
Chennai Metro Breaks Record With Installation Of India’s Longest Precast U-Girder
Coimbatore Metro Land Plan Survey Gains Momentum As 75 Per Cent Work Completed On Sathyamangalam Road
DMRC Secures Rs 5,870 Crore Contract For Operation And Maintenance of Chennai Metro Phase II Network
Chennai Metro To Conduct Study For New Corridors, Regional Rapid Transit System And High-Altitude Ropeway Projects
Coimbatore Metro Survey Kicks Off: LiDAR, DGPS Tech To Map 35 km Twin Corridors
Chennai Metro Submits Rs 9,744 Crore DPR For 21.76 Km Koyambedu-Pattabiram Expansion With 19 Elevated Stations
CMRL Allocates Rs 154 Crore For Land Acquisition For Coimbatore Metro, Paving Way For Expansion
Tamil Nadu: CMRL To Complete Feasibility Reports For Tiruchi And Salem MRTS Soon
Trichy’s Mobility Plan Identifies Three Metro Rail Corridors To Strengthen City’s Long-Term Public Transport Infrastructure
Chennai Suburban Rail Seeks To Emulate Mumbai, Commissions Feasibility Study For Introducing AC Coaches In 60 Km Beach-Tambaram Line
Chennai Metro Phase II: CMRL To Partially Raze Flyovers At Adyar and Royapettah High Road To Work On Underground Stations
15.3 km Metro Line Connecting Chennai Airport And Upcoming Kilambakkam Bus Terminus Gets Approval City's Nodal Transport Authority CUMTA
Chennai Metro Phase II: Special Tunnel Boring Machines To Be Used In Madhavaram-SIPCOT Line
Chennai Metro: CMRL Invites Bids For Underground Stations, Twin Tunnels On Line 5
Chennai Metro: CMRL Installs 500-Litre RO Plant To Provide Free Drinking Water Facility To Commuters
Chennai Airport To Display Metro Timings In Its Terminals To Encourage Travellers To Use Transport Service
Chennai Metro: Despite Last Leg Of Phase-I Nearing Completion, CMRL To Still Operate Two Routes To Airport
Metro’s Chennai Central To Washermanpet and Chennai Central to AG-DMS Stretches To Open By January
Chennai Metro Cares: Builds Subway Between Anna Nagar East And Anna Tower Station
With Planned Resumption Of Monorail Services Next Month, MMRDA Tries To Get Telecom Sector On Board To Boost Revenue
Emission-Free Last-Mile Connectivity: Why Bengaluru Must Build Safe Cycle Tracks Than Go After Pod Taxis